Test & certification
Documentation, acceptance testing and certification against the applicable standards, including the AIV plan with its test cases and test procedures, and CE marking on complete systems.
What it covers
Covers planning and running the test campaign — AIV plan, test cases, procedures — and the conformity side: technical analysis for CE marking, risk assessment and mitigation, support to certification. It applies both at the factory and on site, with IN SY TO either conducting the campaign or supporting it, according to the role assigned within the programme.
What it leaves behind
It leaves the documents that make a delivery acceptable to whoever receives it: test procedures, reports with measured results, non-conformances raised and closed, acceptance records, technical file and declaration of conformity. That file is what makes a supplier qualifiable: without it, a system that works is still only a claim.
Where it ends, where the next one starts
It begins once the system is integrated and powered, and ends with the signed acceptance record. Open non-conformances go back to the phase that produced them, and the loop closes only when the test concerned is repeated and passes.
Evidence in the portfolio
Documented by 22 programmes out of 26 published.
This list is not written by hand: it is derived from the “Work performed” entries of the programme cards. Next to each title is the line that matched the programme, so the match can be checked — and disputed. A new card joins on its own.
P—01
Universal work-holding fixture for helicopter blades
On-site installation and AIT activities
P—02
Communication SCOE for a satellite payload, accepted in factory and on site
Support to AIT activities at factory acceptance (FAT)
P—03
Interface adapter between an existing test bench and an orbital module
Support to integration and AIT activities
P—04
Rack tool for revalidating the electrical interfaces of a launch bench
Support to integration and AIT activities
P—05
Launcher control bench
Support to AIT activities in factory
P—06
Cabinet for an observation payload data chain
Support to AIT activities
P—07
Telemetry SCOE for a vehicle control bench
Support to software development, installation and test
P—08
Rack telemetry kit for a satellite relay link
Software development, installation and test
P—09
Vehicle control bench for a European launch vehicle, including cable routing in the launch building
AIT activities
P—10
Payload links SCOE for a vehicle control bench, installed at a launch base
AIT activities
P—11
EGSE and SCOE system design for third parties
Support to integration and AIT activities
P—12
Bench simulators: pyrotechnic lines and electrical loads
AIT activities and support to AIT activities
P—13
Interface and self-test box for a check-out chain
Support to AIT activities
P—14
Telemetry, telecommand and radio-frequency sections of an automatic test equipment
Support to AIT activities
P—15
LVDS interface chassis for an on-board memory unit, with clean-room harness
Support to CE certification of the complete memory unit
P—16
Enclosed CE-marked test benches for railway gearboxes and wheelsets
Technical analysis for CE marking, with risk evaluation and mitigation
P—17
Modular rack battery pack charger for a launch vehicle
Support to integration and AIT activities
P—18
Input/output front-end electronics for a payload data chain
Support to AIT activities
P—19
RF switch matrix for a radiometer test chain
Assembly, integration and test (AIT)
P—20
RF switch matrix for a check-out bench
Assembly, integration and test (AIT)
P—21
Antenna control unit with web interface
AIT activities
P—22
Simulation SCOE for a radar payload
AIT conducted at FAT and OSAT