Sheet begins
DWG IST · Engineering disciplines · Rev. 02 · Scale 1:1
- Subject
- Engineering disciplines
- Entry
- B—05
- Applies to
- all capabilities
- Drawing
- 1:1 · Rev. 02
Independent verification and validation
Verification and validation conducted independently, and safety assessments for railway and industrial applications.
What it covers
Verification and validation carried out by people who wrote neither the design nor the software, so that the result does not depend on whoever produced it. It includes safety assessment for railway and industrial applications, where the assessor's independence is required by the standard.
What it leaves behind
Verification and validation plan, independent verification reports, safety assessments, and observations raised against the supplier until they are closed.
Evidence in the portfolio
The programme cards state the work performed by capability — design, development, integration, AIT, installation — not the discipline under which it was carried out. A list of programmes here could only be built by attributing a discipline, after the fact, to an activity that does not name one: that would be an inference of ours presented as a fact. Until the cards state it, this page stops at the definition.
Sheet ends · shell resumes