Sheet begins

DWG IST · Engineering disciplines · Rev. 02 · Scale 1:1

Subject
Engineering disciplines
Entry
B—01
Applies to
all capabilities
Drawing
1:1 · Rev. 02

Systems engineering and requirements

System architecture, requirements and technical specification management, from preliminary proposal to final qualification.

What it covers

Holds the system together as a whole: it breaks the customer requirements down into subsystem requirements, fixes the interfaces, and maintains traceability between what was asked for and what is delivered. It is not a phase — it runs inside all five capabilities, from preliminary proposal to final qualification.

What it leaves behind

System specification, requirement tree, traceability matrix, interface control documents, and the reference configuration every later change is measured against.

Evidence in the portfolio

The programme cards state the work performed by capability — design, development, integration, AIT, installation — not the discipline under which it was carried out. A list of programmes here could only be built by attributing a discipline, after the fact, to an activity that does not name one: that would be an inference of ours presented as a fact. Until the cards state it, this page stops at the definition.

Sheet ends · shell resumes